Form · FRM-47
On-Site Work Record
Environmental conditions, equipment used and transport checks for work at customer premises.
Purpose
The record for work performed at customer premises: site details and risk assessment, equipment taken with pre- and post-transport checks, environmental conditions during the work, items calibrated with identification and condition, deviations and the customer's acknowledgement, per SOP-32. It replaces FRM-25 for on-site receipt and supplements the discipline worksheets.
What it covers
- 1. Kit and equipment taken
- 2. Documents and consumables
- 3. Dynamic risk assessment on site
- 4. Environmental conditions at working position
- 5. Items calibrated
- 6. Deviations, customer requests and acknowledgement
- Authorisation
How to complete it
- 1.Complete Sections 1 and 2 before leaving the Laboratory (site details from FRM-31; kit checklist; pre-transport checks recorded here and on FRM-35).
- 2.On site complete Section 3 (dynamic risk assessment) before starting and Section 4 (conditions) at start, every 30 minutes for long jobs, and at the end.
- 3.List each item in Section 5 with location / tag; note any that could not be calibrated and why.
- 4.Obtain the customer's signature in Section 6; complete post-transport checks within one working day of return.
Before you use it
- Replace every square-bracket token, starting with [LABORATORY NAME], [ADDRESS] and [EFFECTIVE DATE]. The full token list is in GD-01 Read Me First.
- Have the content technically reviewed against how your laboratory actually works, then approved by the responsible manager before it becomes a controlled document.
- Update the Word fields after editing so the table of contents and page numbers are correct: select all, then press F9.
- Record the document in your own document register and set its review date.
Related documents
- QM-01
Quality Manual
Top-level description of the management system against every clause of ISO/IEC 17025:2017.
- SOP-10
Facilities and Environmental Conditions
Specifying, monitoring, controlling and recording the environmental conditions that affect results.
- SOP-32
On-Site Calibration at Customer Premises
Planning, environmental control, equipment transport and records for calibrations performed away from the laboratory.
- FRM-17
Environmental Monitoring Log
Record of temperature, humidity and other environmental conditions against limits.
- CHK-01
ISO/IEC 17025:2017 Gap Analysis and Self-Assessment
Clause-by-clause self-assessment with evidence, gap and action columns.
- FRM-01
Master Document Register
Register of every controlled internal and external document with revision, status and distribution.
- FRM-02
Document Change Request
Request, impact assessment and approval of a change to a controlled document.
- FRM-03
Records Retention Schedule and Disposal Log
Retention periods by record type and a log of authorised disposals.