Skip to content
VTValiTracAI

Checklist · CHK-03

Calibration Certificate Review Checklist

Review gate for every certificate before authorisation and issue.

Purpose

The review gate completed by the authorised signatory for every certificate before authorisation and release, verifying the certificate against the job file and the requirements of ISO/IEC 17025 clauses 7.8.2 and 7.8.4, SOP-18 and SOP-29. A completed checklist is filed in the job file (FRM-42).

What it covers

  • Job file and records
  • Technical content
  • Certificate elements (7.8.2 / 7.8.4)
  • Release
  • Summary, actions and sign-off

How to complete it

  1. 1.The reviewer must be an authorised signatory for the discipline and, where staffing allows, must not be the person who performed the calibration.
  2. 2.Review against the worksheet and job file, not from memory; recompute at least one point.
  3. 3.Any 'No' must be resolved before authorisation, or the certificate is withheld and the issue handled under SOP-08.
  4. 4.Tick each item; record the certificate number and reviewer; file with the job.

Before you use it

  • Replace every square-bracket token, starting with [LABORATORY NAME], [ADDRESS] and [EFFECTIVE DATE]. The full token list is in GD-01 Read Me First.
  • Have the content technically reviewed against how your laboratory actually works, then approved by the responsible manager before it becomes a controlled document.
  • Update the Word fields after editing so the table of contents and page numbers are correct: select all, then press F9.
  • Record the document in your own document register and set its review date.

Related documents

This is an original template published by ValiTrac. It does not reproduce the text of ISO/IEC 17025 or of any accreditation body publication, and it does not by itself confer or guarantee accreditation. Customise, review and approve it before use.