Checklist · CHK-02
UKAS Initial Assessment Preparation Checklist
Everything to have ready before the pre-assessment and initial assessment visits.
Purpose
A preparation checklist for the accreditation body's pre-assessment and initial assessment visits (and, with minor adaptation, for surveillance and reassessment), covering the documentation, records, people, facilities and logistics that assessors expect to find. It complements GD-02 and CHK-01.
What it covers
- A. Application and scope
- B. Management system documentation
- C. Records demonstrating operation
- D. Technical readiness
- E. People
- F. Facilities and logistics
- Summary, actions and sign-off
How to complete it
- 1.Start at least three months before the planned visit; assign an owner to each item; review progress weekly.
- 2.Where an item cannot be completed, record the reason and what will be said to the assessment team.
- 3.Prepare a document pack (electronic) indexed by clause using GD-03 so that any requested document can be produced within minutes.
- 4.Verify the current accreditation-body process, forms and fees with the body itself; this checklist is guidance, not the body's requirements.
Before you use it
- Replace every square-bracket token, starting with [LABORATORY NAME], [ADDRESS] and [EFFECTIVE DATE]. The full token list is in GD-01 Read Me First.
- Have the content technically reviewed against how your laboratory actually works, then approved by the responsible manager before it becomes a controlled document.
- Update the Word fields after editing so the table of contents and page numbers are correct: select all, then press F9.
- Record the document in your own document register and set its review date.
Related documents
- CHK-01
ISO/IEC 17025:2017 Gap Analysis and Self-Assessment
Clause-by-clause self-assessment with evidence, gap and action columns.
- CHK-03
Calibration Certificate Review Checklist
Review gate for every certificate before authorisation and issue.
- CHK-04
Temperature Mapping Study Checklist
Protocol, sensors, placement, duration, loading, analysis and report content.
- CHK-05
Mapping Data Quality Checklist
Units, timestamps, gaps, duplicates, flatlines, jumps, identifiers and metadata.
- CHK-06
Supplier Calibration Certificate Acceptance Checklist
Acceptance review for incoming calibration certificates from external providers.