What a temperature mapping report should contain
A report is a technical record that lets a reader who was not present understand what was done, what was found and what was decided.
The report closes the loop opened by the protocol. Its reader may be an auditor years later, so it has to stand alone.
Structure
- Study information: space, dates, protocol reference, personnel, loading condition.
- Dataset: loggers used, calibration evidence, sampling interval, total records, unit of temperature.
- Data preparation and quality: gaps, duplicates, sensor faults, exclusions and the reason for each.
- Configuration: acceptance limits, excursion definition, analysis criteria.
- Per-sensor statistics: minimum, maximum, mean and spread, with the study-wide summary.
- Hot and cold spots, with the sensors, locations and values that identify them.
- Excursions: sensor, start, end, duration, peak, and assessment.
- Limitations: what the study could not show (season, loading, events).
- Findings and recommendations, including monitoring locations.
- Review and approval with names, roles and dates; version history.
A draft report should be visibly marked as not approved until the review is complete. ValiTrac's mapping engine produces exactly this structure and keeps the draft flag until a reviewer signs off.
The section-by-section test
The report's reader may be an auditor several years later with no access to the people involved. Each section therefore has to answer a question that reader will have, and a section that does not answer one is padding.
| Section | The reader's question |
|---|---|
| Study information | What space, when, under what protocol, loaded how, by whom? |
| Dataset | What equipment produced this, in what units, at what interval, and how many readings should there be? |
| Data quality | What was wrong with the data, and what was done about each finding? |
| Statistics | Per sensor: min, max, mean, and the study aggregate |
| Hot and cold spots | Which positions, by which stated criterion, and how far from the rest? |
| Excursions | Each one: sensor, start, duration, peak, and whether it breaches the criteria |
| Assessment against criteria | Pass or fail, per criterion, with the decision rule that was applied |
| Conclusions and actions | What can be stored where, what must change, and who owns each action |
| Approval | Who reviewed this, when, and on what authority |
Conclusions that are actually usable
The weakest part of most mapping reports is the conclusion, which says the study met its acceptance criteria and stops. That is a verdict, not a result. What the site needs is a statement it can act on: which positions are approved for product storage, which are excluded and how the exclusion is enforced, where the monitoring sensor must be placed or moved to, what the re-mapping interval is and why, and what limitations the reader should carry forward.
Every action needs an owner and a date. A report that recommends relocating the monitoring probe and is filed without anyone relocating it has documented a known, unresolved risk — which is materially worse than never having looked.
Draft until signed
- Mark the draft visibly as not approved, on every page, until the technical review is complete. A draft circulating without that mark will be quoted as final by someone.
- The reviewer is a competent person who did not perform the analysis, and the review record says what was checked, not just that it happened.
- Attach the evidence: raw data export, logger calibration certificates, photographs of sensor positions, the approved protocol.
- Version amendments properly. An amended report references the version it replaces, and the original is retained.
A useful final check: hand the report to a colleague who was not involved and ask them to state where the hot spot is and why the monitoring sensor sits where it does. If they cannot, the report is not yet standing alone.
Frequently asked questions
- What statistics should a mapping report include?
- Per-sensor minimum, maximum, mean and spread (standard deviation or range), a study-wide summary, the identified hot and cold spots, and every excursion with start, end, duration and peak.
- Should raw data be attached to the mapping report?
- Yes — or referenced with a retrievable identifier. The raw export is the original record; the report is a derived document.
References
- [1]WHO Technical Supplement 8 to TRS 961 Annex 9: Temperature mapping of storage areas (2015)
General technical guidance written against the cited sources. It is not regulatory or legal advice and does not replace the applicable standard, guideline or a qualified reviewer's judgement.
Have a question on this topic?
Ask ValiTrac AI and see the evidence and calculation behind the answer.
Ask ValiTrac AIFree calculator: Sampling interval
See what a logger actually records from the same 24 hours at 1, 5, 15, 30 or 60 minute intervals, and watch a real excursion disappear.
Open the calculatorTemperature Mapping on ValiTrac
Analyse logger data and identify data-quality issues, statistics, hot/cold spots and excursions.
Explore mappingRelated articles
What a temperature mapping protocol should contain
The protocol is the contract for the study: fix the purpose, limits, sensor plan and analysis rules before a single logger is placed.
How to identify hot and cold spots
Hot and cold spots are defined by the data and the limits together — and the definition should be fixed before the analysis starts.