Outsourcing a temperature mapping study: what to specify

A mapping contractor needs your acceptance criteria, layout, operating conditions and reporting expectations. Without them you get a generic study that may not answer your question.

ValiTrac AI editorialUpdated 2026-09-132 min read
  • Acceptance criteria from your products, and how uncertainty is treated.
  • Scope: areas, zones, empty and/or loaded, seasonal runs, door-opening and power-failure tests.
  • Sensor count and placement rationale, to be approved before the study.
  • Logger calibration: certificates from an accredited laboratory, points spanning the study range, verification after the study.
  • Sampling interval and duration.
  • Report content: statistics per position, hot/cold spots, recommended monitoring positions, deviations, raw data files.
  • Data ownership and retention: you keep the data.
  • Contractor's quality system and staff competence.

ValiTrac's mapping engine is designed to analyse contractor-delivered data independently, so a report can be checked rather than accepted on trust.

Frequently asked questions

Should the contractor also write the protocol?
They can draft it, but you must approve it. The acceptance criteria and scope are your decisions.

References

  1. [1]ISO/IEC 17025:2017 — General requirements for the competence of testing and calibration laboratories

General technical guidance written against the cited sources. It is not regulatory or legal advice and does not replace the applicable standard, guideline or a qualified reviewer's judgement.