Reporting uncertainty: rounding and significant figures
Report the expanded uncertainty to at most two significant figures, round the result to the same decimal place, and state the coverage factor.
An expanded uncertainty of 0.11734 °C claims knowledge no budget can support. The GUM recommends reporting U to at most two significant figures, and the measured value rounded to the decimal place of U. Rounding of intermediate values is avoided; rounding happens once, at the end.
Examples
- Correction +0.0473 °C, U = 0.0316 °C → report +0.047 °C, U = 0.032 °C (k = 2).
- Reading 21.8367 °C, U = 0.12 °C → report 21.84 °C ± 0.12 °C (k = 2).
Form of words
The GUM suggests a form such as: 'The reported expanded uncertainty is based on a standard uncertainty multiplied by a coverage factor k = 2, providing a level of confidence of approximately 95 %.' Accredited certificates carry an equivalent statement.
The rule, and why it exists
GUM §7.2.6 asks for the expanded uncertainty to be given to at most two significant figures, with the reported value rounded to the same decimal place. The reason is not tidiness. An uncertainty is itself an estimate, built from other estimates, several of which came from a specification sheet or an engineering judgement. Quoting it to five figures claims a precision about the uncertainty that no budget in this field can support, and it is one of the things an assessor will notice first because it signals that the numbers were copied out of a spreadsheet rather than read.
| As computed | As reported | Note |
|---|---|---|
| +0.0473 °C, U = 0.03162 °C | +0.047 °C, U = 0.032 °C (k = 2) | Two figures on U; value matched to it |
| 21.8367 °C, U = 0.1204 °C | 21.84 °C ± 0.12 °C (k = 2) | U to two figures fixes the value at two decimals |
| −0.0081 °C, U = 0.0702 °C | −0.008 °C, U = 0.070 °C (k = 2) | The trailing zero is significant; keep it |
| 1.7 °C, U = 0.96 °C | 1.7 °C, U = 1.0 °C (k = 2) | Rounding up across the decade is normal, not an error |
Round once, at the end
Every intermediate value carries full precision until the final report. Rounding each component before combining introduces an error that compounds through the quadrature sum, and rounding u_c before expanding it is the commonest version. Carry the digits, expand, then round the pair together.
The exception worth knowing is GUM §7.2.6's own allowance: where rounding down would reduce the uncertainty by more than about 5 %, round up instead. Reporting 0.0996 as 0.099 is fine; reporting a computed 1.04 as 1.0 when the difference matters is the case the allowance covers.
The statement that goes with the number
A number without a coverage factor cannot be compared with any other number. The GUM's recommended form, which accredited certificates carry in some variation, is: the reported expanded uncertainty is based on a standard uncertainty multiplied by a coverage factor k = 2, providing a level of confidence of approximately 95 %.
- Always state k, or the coverage probability, or both. A bare ± figure is ambiguous by a factor of two or more.
- Say approximately 95 %, not 95 %. The coverage is approximate unless effective degrees of freedom were evaluated and k chosen accordingly.
- Give the unit of the uncertainty explicitly, and say whether it is absolute or relative. Relative uncertainties quoted as a bare percentage next to a temperature are a recurring source of confusion.
- Keep the result and its uncertainty at the same decimal place throughout the document, including in tables and summaries, so a reader is never asked to reconcile two versions of the same figure.
Frequently asked questions
- Should U be rounded up or to nearest?
- Round to nearest unless doing so reduces U by more than a few percent, in which case rounding up is the conservative convention.
References
- [1]JCGM 100:2008 — Guide to the expression of uncertainty in measurement (GUM)
- [2]ISO/IEC 17025:2017 — General requirements for the competence of testing and calibration laboratories
General technical guidance written against the cited sources. It is not regulatory or legal advice and does not replace the applicable standard, guideline or a qualified reviewer's judgement.
Have a question on this topic?
Ask ValiTrac AI and see the evidence and calculation behind the answer.
Ask ValiTrac AIFree calculator: Uncertainty budget
Combine Type A and Type B components per the GUM: divisors by distribution, sensitivity coefficients, u_c, effective degrees of freedom and U at k = 2.
Open the calculatorMetrology on ValiTrac
Measurement science, traceability, uncertainty and technical evidence.
Ask a metrology questionRelated articles
Coverage factor k explained: why k = 2 means about 95 %
The coverage factor multiplies combined standard uncertainty to give expanded uncertainty. k = 2 is about 95 %, but only when the distribution is normal.
What should a calibration certificate contain?
A checklist for reading a certificate — and the items whose absence should make you ask questions.