A protocol says what will be tested, how, by whom, and what result counts as a pass — all approved before execution begins.

ValiTrac AI editorialUpdated 2026-09-132 min read
  • Title, unique identifier, version, approvals (author, reviewer, quality).
  • Purpose, scope and system description.
  • References: URS, DQ, drawings, procedures, standards.
  • Responsibilities.
  • Prerequisites: calibration status of test equipment, training, completed prior stages.
  • Test procedures, each with: requirement reference, method, equipment, acceptance criterion, result field, executed by/date.
  • Deviation handling and how results are recorded.
  • Attachments: calibration certificates, raw data, diagrams.

The report mirrors the protocol test by test, adds the deviations and their resolution, and states whether the system is qualified — signed by the same roles that approved the protocol.

Frequently asked questions

Can acceptance criteria be changed after execution?
Only through a documented, justified and approved amendment — and changing a criterion to make a failed test pass is exactly what inspectors look for.

References

  1. [1]EudraLex Volume 4, Annex 15: Qualification and Validation (2015)

General technical guidance written against the cited sources. It is not regulatory or legal advice and does not replace the applicable standard, guideline or a qualified reviewer's judgement.