Skip to content
ValiTracAI

Temperature mapping study checklist

Everything to settle before loggers go in, watch during the study, check in the analysis and include in the report.

33 items · Based on WHO Technical Supplement 8 (TRS 961 Annex 9), EU GDP chapter 3, EU GMP Annex 15

Before the study

During the study

Analysis

Report and follow-up

General technical guidance written against the cited sources. Adapt it to your procedures; it is not a substitute for the applicable standard or a qualified reviewer's judgement.